|
|||||||||||
|
|||||||||||
|
|||||||||||
|
TOWN OF ORANGETOWN ARCHITECTURE AND COMMUNITY APPEARANCE BOARD OF REVIEW
Meeting of JUNE 17, 2008
MEMBERS PRESENT: Jack Messina, Chairperson; James Dodge, Vice Chairperson; Larry Vail; John Keahon; Jill Fieldstein ; Paul Papay and Thomas Miggie MEMBER ABSENT: None ALSO PRESENT: Barbara Gionti, Deputy Town Attorney, Ann Marie Ambrose, Stenographer and Cheryl Coopersmith, Chief Clerk
Jack Messina, Chairperson, called the meeting to order at 7:30 PM. Mr. Messina read the agenda. Hearings as listed on this meeting's agenda which are made a part of these minutes were held as noted below.
Can - Am Development Corp. Plans-ACABOR #08- 21- Approved with Conditions; Review of Site/Structure Plans; 77.16/1/20.14; R-15 zone
Barrett Plans- ACABOR #08- 22- Approved with Conditions- Review of Site/Structure Plans; 69.15/1/12; R-40 zone
19 Shadyside Avenue Plans- ACABOR #08-23- Approved with Conditions; Review of Site/Structure Plans (Critical Environmental Area); 66.17/1/9; R-22 zone
The Pointe at Lake Tappan Plans- ACABOR #08- 24- Approved with Conditions- Review of Site/Structure Plans; 73.10/1/4; OP & PAC zones
A motion was made to adjourn the meeting by Thomas Miggie and seconded by Larry Vail and agreed by all in attendance. The Decisions on the above hearings, which Decisions are made by the Board before the conclusion of the meeting and are mailed to the applicant. The verbatim minutes are not transcribed, but are available. As there was no further business before the Board, the meeting was adjourned at 10:15 p.m. The next ACABOR Meeting is scheduled for July 8, 2008. Dated: June 17, 2008 Town of Orangetown Architecture and Community Appearance Board of Review Cheryl Coopersmith, Chief Clerk
-------------- ACABOR #08-21 TOWN OF ORANGETOWN ARCHITECTURE AND COMMUNITY APPEARANCE BOARD OF REVIEW - DECISION June 17, 2008
Can-Am Development Corporation Plans; Approved Subject to Conditions
TO: Eli Stern, 10 Nelson Road, Monsey, New York 10952 FROM: Architecture and Community Appearance Board of Review RE: The application of Can-Am Development Corporation, owner, for the review of House and Site Plans for a site to be known as “Can-Am Development Corporation Plans”, in accordance with Article 16 of the Town Law of the State of New York and Chapter 2 of the Code of the Town of Orangetown. The site is located on Lauren Road, Palisades, Town of Orangetown, Rockland County, New York and as shown on the Orangetown Tax Map as Section 77.16, Block 1, Lot 20.14 in the R-15 zoning district.
Heard by the Architecture and Community Appearance Board of Review of the Town of Orangetown at a meeting held Tuesday, June 17, 2008, at which time the Board made the following determinations: Eli Stern and Donald Brenner appeared and testified. The Board received the following items: 1. Site Plan prepared by HDR, dated October 4, 2006, revised March 5, 2007. 2. Architectural Plans prepared by James Tanner, RA: 1 of 3: Foundation Plan: November 4, 2004, last revised May 7, 2008 2 of 3: Main Floor Plan/Section: November 3, 2004, last revised May 7, 2008 3 of 3: Elevations, Alt. Gar. Plan, Tray Clg, Det.: November 5, 2004 FINDINGS OF FACT:
Public Comment: Ellen Charyed: 8 Lauren Road, Tappan; raised concerns regarding the location of the proposed driveway. She wanted to know if there was a buyer for the house. Ms Charyed requested that the developer be required to preserve as many trees on the site as possible and wanted to make sure that the Tennessee Valley Gas Company is made aware of the construction.
DECISION: In view of the foregoing and the testimony before the Board, the application was APPROVED SUBJECT TO THE FOLLOWING CONDITIONS: 1. The Site Plan contains the following note: “There shall be no clearing of vegetation, grading or structures beyond (toward wetland) the limit of disturbance line except as authorized by the NYS Department of Environmental Conservation (DEC) under a Permit Pursuant to Article 24 of the ECL.” 2. The proposed house shall have four sides of vinyl siding in Desert Tan color, manufactured by Certanteed, with cultured stone on the chimney in rectangular shaped stones in earth tones. The “chimney flute” shall be encased and covered with cultured stone. Both the chimney and the encased chimney flute shall have decorative chimney caps. The architectural plans shall be revised to reflect this change. 3. The house siding shall be brought down to grade. The roof shall be Rustic Cedar color, manufactured by Tamko. The house trim and the garage doors shall have a decorative element such as mini sunburst windows with lighting on either side of the doors. The color of the garage doors shall match the main color of the house siding. The architectural plans shall be revised to reflect this change. 4. The porch railing shall be treated stained wood and the front stairway shall be cement covered with stone veneer and blue stone tops. The architectural plans shall be revised to reflect this change. 5. The applicant has the option of placing decorative stonework on the front facade surrounding the front entryway. The stonework would match the chimney. If the change is selected, the architectural plans shall be revised. 6. Trees to be saved shall be protected with snow fencing to the drip line during construction. 7. No grading is to take place within five feet of any property line, except as specified on the approved site plan. 8. The applicant shall comply with the requirements of Section 21-25 of the Town of Orangetown Shade Tree Ordinance. The foregoing resolution was presented and moved by Paul Papay and seconded by Jill Fieldstein and carried as follows: James Dodge, absent; John Keahon, aye; Thomas Miggie, aye, Jack Messina, aye, Jill Fieldstein, aye; Paul Papay, aye and Larry Vail, aye. The Clerk to the Board is hereby authorized, directed and empowered to sign this Decision and file a certified copy in the Office of the Town Clerk and the Office of the Architecture and Community Appearance Board of Review.
Dated: June 17, 2008 Town of Orangetown Architecture and Community Appearance Board of Review Cheryl Coopersmith, Chief Clerk
------------------------------------------------------------------------------ ACABOR #08-22 TOWN OF ORANGETOWN ARCHITECTURE AND COMMUNITY APPEARANCE BOARD OF REVIEW - DECISION June 17, 2008
Barrett Plans; Approved Subject to Conditions
TO: Thomas and Beatrice Barrett, 83 Sickletown Road, Pearl River, New York 10965 FROM: Architecture and Community Appearance Board of Review
RE: The application of Thomas Barrett, owner, for the review of House and Site Plans for a site to be known as “Barrett Plans”, in accordance with Article 16 of the Town Law of the State of New York and Chapter 2 of the Code of the Town of Orangetown. The site is located at 83 Sickletown Road, Pearl River, Town of Orangetown, Rockland County, New York and as shown on the Orangetown Tax Map as Section 69.15, Block 1, Lot 12 in the R-40 zoning district.
Heard by the Architecture and Community Appearance Board of Review of the Town of Orangetown at a meeting held Tuesday, June 17, 2008, at which time the Board made the following determinations: Barry Terach and Thomas and Beatrice Barrett appeared and testified. The Board received the following items: 1. Site Plan prepared by Robert Sorace, PLS, dated April 22, 2008, revised May 5, 2008. 2. Architectural Plans prepared by Barry Terach, RA: A-1:Basement Plan, dated March 30, 2008 A-2: First Floor Plan, dated March 30, 2008 A-3: Second Floor Plan, dated March 30, 2008 A-4: Roof Plan, dated March 30, 2008 A-5: Elevations, Window Schedule, Light and Vent Calc's, dated May 13, 2008, revised May 19, 2008 A-6: Elevations, dated May 13, 2008 A-7: Elevations & Building Section, dated May 13, 2008 FINDINGS OF FACT:
DECISION: In view of the foregoing and the testimony before the Board, the application was APPROVED SUBJECT TO THE FOLLOWING CONDITIONS:
1. The proposed house shall have four sides of stucco with decorative stonework. The stucco will be California Stucco in Ivory color with trim in Sea Grass Green. The stonework will be in a natural granite stone, placed on the chimney, over some of the windows and on the house facade. The Board gave the applicant the option of placing stone over the windows on the right elevation. The plans shall be revised if this option is selected. 2. The plans shall be revised to note a front entryway stairway having stone risers with bluestone slab treads (Front Elevation - A-5). The plans shall be revised to reflect the change in the stairway. 3. The garage doors shall be a natural stained wood and the roof shingles will be Mission Brown color, manufactured by Timberline 4. Trees to be saved shall be protected with snow fencing to the drip line during construction. 5. No grading is to take place within five feet of any property line, except as specified on the approved site plan. 6. The applicant shall comply with the requirements of Section 21-25 of the Town of Orangetown Shade Tree Ordinance. The foregoing resolution was presented and moved by Thomas Miggie and seconded by Larry Vail and carried as follows: James Dodge, absent; John Keahon, aye; Thomas Miggie, aye, Jack Messina, aye, Jill Fieldstein, aye; Paul Papay, aye and Larry Vail, aye. The Clerk to the Board is hereby authorized, directed and empowered to sign this Decision and file a certified copy in the Office of the Town Clerk and the Office of the Architecture and Community Appearance Board of Review.
Dated: June 17, 2008 Town of Orangetown Architecture and Community Appearance Board of Review Cheryl Coopersmith, Chief Clerk
---------------------------------------------------------------- .
ACABOR #08-23 TOWN OF ORANGETOWN ARCHITECTURE AND COMMUNITY APPEARANCE BOARD OF REVIEW - DECISION June 17, 2008
19 Shadyside Plans; Approved Subject to Conditions
TO: Jay Greenwell, PLS; 85 Lafayette Avenue; Suffern, New York 10901 FROM: Architecture and Community Appearance Board of Review RE: The application of Abraham Pesach, owner, for the review of House and Site Plans for a site to be known as “19 Shadyside Plans”, in accordance with Article 16 of the Town Law of the State of New York and Chapter 2 of the Code of the Town of Orangetown. The site is located at 19 Shadyside, Upper Grandview, Town of Orangetown, Rockland County, New York and as shown on the Orangetown Tax Map as Section 66.17, Block 1, Lot 9 in the R-22 zoning district.
Heard by the Architecture and Community Appearance Board of Review of the Town of Orangetown at a meeting held Tuesday, June 17, 2008, at which time the Board made the following determinations: Robert Hoene and Jay Greenwell appeared and testified. The Board received the following items: 1. Site Plan prepared by Jay Greenwell, PLS, dated May 31, 2007, last revised May 20, 2008. 2. Architectural Plans prepared by Robert Hoene, RA, dated May 2007, revised February 25, 2008: - A-1: South Elevation - A-2: West Elevation - A-3: Foundation Plan and Typical Wall Section - A-4: First Floor - A-5: Second Floor Plan 3. A copy of PB #07-49, Preliminary Site Plan Approval Subject to Conditions, dated April 23, 2008 and ZBA #08-42, Variances Granted, dated May 7, 2008. FINDINGS OF FACT:
DECISION: In view of the foregoing and the testimony before the Board, the application was APPROVED SUBJECT TO THE FOLLOWING CONDITIONS: 1. The proposed house shall have four sides of Hardiplank siding in Kaki color, with kaki colored shakes and decorative stonework on the facade and the chimney. The stonework will be manufactured by Stonecraft in Manzanita Cliffstone, in rectangular shaped stones in natural stone shades. The roof will be Weathered Wood Blend color, manufactured by Tamko. The garage doors will be in a Carriage Style and will be stained to match the main color of the house facade. The railing and windows will be white 2. The air conditioner units will be tucked by the west elevation, off to the right side. 3. Standard residential lighting will be used, down lights on the front porch. 4. The applicant shall try and save a 34 inch oak tree on the site. 5. Trees to be saved shall be protected with snow fencing to the drip line during construction. 6. No grading is to take place within five feet of any property line, except as specified on the approved site plan. 7. The applicant shall comply with the requirements of Section 21-25 of the Town of Orangetown Shade Tree Ordinance. The foregoing resolution was presented and moved by Jack Messina and seconded by John Keahon and carried as follows: James Dodge, absent; John Keahon, aye; Thomas Miggie, aye, Jack Messina, aye, Jill Fieldstein, aye; Paul Papay, aye and Larry Vail, aye. The Clerk to the Board is hereby authorized, directed and empowered to sign this Decision and file a certified copy in the Office of the Town Clerk and the Office of the Architecture and Community Appearance Board of Review.
Dated: June 17, 2008 Town of Orangetown Architecture and Community Appearance Board of Review Cheryl Coopersmith, Chief Clerk
-----------------------------------
ACABOR #08-24 TOWN OF ORANGETOWN ARCHITECTURE AND COMMUNITY APPEARANCE BOARD OF REVIEW - DECISION June 17, 2008
The Pointe at Lake Tappan Plans; Approved Subject to Conditions
TO: Donald Brenner, P.E., LL.B.;4 Independence Avenue; Tappan, New York 10983 FROM: Architecture and Community Appearance Board of Review RE: The application of Pearl River Veterans, LLC, owner, for the review of a Site/Structure Plans, which includes the Seth House, Elevations for Units, Court yard Color Schemes, Layouts, Site Lighting and Landscaping Plans and Site Signage for a site known as “The Pointe at Lake Tappan Plans”, in accordance with Article 16 of the Town Law of the State of New York and Chapter 2 of the Code of the Town of Orangetown. The site is located at west side of Blue Hill South at the intersection of Veterans Memorial Drive, Pearl River, Town of Orangetown, Rockland County, New York and as shown on the Orangetown Tax Map as Section 73.10, Block 1, Lot 4, in the OP & PAC zoning districts.
Heard by the Architecture and Community Appearance Board of Review of the Town of Orangetown at a meeting held Tuesday, June 17, 2008, at which time the Board made the following determinations: Donald Brenner, Ann Brooke and Frank Lisowsky appeared and testified. The Board received the following item:
C1.08: Soil Erosion Control Plan Unit A1: First Floor and Second Floor Plans Unit A2: First Floor and Second Floor Plans Unit B: First Floor and Second Floor Plans Unit C: First Floor and Second Floor Plans Unit D: First Floor and Second Floor Plans Unit A1: Color Schemes: Almond, Taupe, Grey and Cream Facades Unit A2: Color Schemes: Almond, Taupe, Grey and Cream Facades Unit B: Color Schemes: Almond, Taupe, Grey and Cream Facades Unit C: Color Schemes: Almond, Taupe, Grey and Cream Facades Unit D: Color Schemes: Almond, Taupe, Grey and Cream Facades Courtyard A Streetscape: View 1 and View 2 Courtyard B Streetscape: View 1 and View 2 Courtyard C Streetscape: View 1 and View 2 Courtyard D Streetscape: View 1 and View 2 Courtyard E Streetscape: View 1 and View 2 Courtyard F Streetscape: View 1 and View 2 Courtyard G Streetscape: View 1 and View 2 Courtyard H Streetscape: View 1 and View 2 Courtyard J Streetscape: View 1 and View 2 Courtyard K Streetscape: View 1 and View 2 Courtyard L Streetscape: View 1 and View 2 Courtyard M Streetscape: View 1 and View 2 Courtyard N Streetscape: View 1 and View 2 Courtyard P Streetscape: View 1 and View 2 Courtyard Q Streetscape: View 1 and View 2 Courtyard R Streetscape: View 1 and View 2 Courtyard S Streetscape: View 1 and View 2
Page 1 of 15: Recreation Center Page 2 of 15: Pod A & B Page 3 of 15: Pod C Page 4 of 15: Pod D & E Page 5 of 15: Pod F Page 6 of 15: Pod G & H Page 7 of 15: Pod J Page 8 of 15: Pod K & L Page 9 of 15: Pod M, N, R, S and Center Planting Page 10 of 15: Pod Plant Schedules Pods M, N, R, S & Center Planting Page 11 of 15: Pod P & Q Page 12 of 15: Pod Subdivision Entrance Page 13 of 15: Lighting Guidelines Page 14 of 15: Planting Instructions Page 15 of 15: General Notes
Sheet 1: General Sheet 2: Basement Plan Sheet 3: First Floor Plan Sheet 4: Second Floor Plan Sheet 5: Elevations Sheet 6: Elevations
FINDINGS OF FACT:
The Board found that the presented sign plans were acceptable. Public Comment: Mark Griffith, resident of Pearl River, supported the proposed development.
DECISION: In view of the foregoing and the testimony before the Board, the application was APPROVED SUBJECT TO THE FOLLOWING CONDITIONS:
The colors of the proposed residential units are as follows:
The applicant also presented a rendering of the proposed Recreation Center. The applicant shall return to the Architecture and Community Appearance Board of Review to architectural plans for the Recreation Center for review and approval.
The foregoing resolution was presented and moved by Thomas Miggie and seconded by Jack Messina and carried as follows: James Dodge, absent; John Keahon, aye; Thomas Miggie, aye, Paul Papay, aye, Jill Fieldstein, aye, Jack Messina, aye and Larry Vail, aye. The Clerk to the Board is hereby authorized, directed and empowered to sign this Decision and file a certified copy in the Office of the Town Clerk and the Office of the Architecture and Community Appearance Board of Review.
Dated: June 17, 2007 Town of Orangetown Architecture and Community Appearance Board of Review Cheryl Coopersmith, Chief Clerk
Created by building. Last modified 2008-07-11 13:18:51. |
||||||||||